Special Structures & Specialist Verifier
- Aigle Velodrome - World Cycling Centre - Aigle Velodrome - World Cycling Centre - Sector: Special Structures - Category: Space structures, tensegrities, cable networks, pneumatic structures - Client: International Cycling Union - Location: Aigle (CH) - Year: 2000-2002 - Engineer: Dr. Antonio Paronesso formally at Passera & Pedretti SA - Services provided: Design, conception of construction details, local construction and accounting management with final cost settlement, velodrome covering including steel ring composed of bipyramidal modules, cable network and pneumatic covering membrane 
- The Cloud of Yverdon - The Cloud of Yverdon - Sector: Special Structures - Category: Space structures, tensegrities, cable networks - Client: Expo.02 - Location: Yverdon (CH) - Year: 2001-2002 - Engineer: Dr. Antonio Paronesso formally at Passera & Pedretti SA - Services provided: Structural design, local construction and accounting management with final cost settlement, design of construction details, steel structure exhibition platform consisting of bipyramidal modules, walkway gratings, suspended access and connection stairs, suspended technical room for fog system 
- Floating pontoon harbour of Maccagno - Floating pontoon harbour of Maccagno - Sector: Special structures - Category: Floating pontoons in prestressed reinforced concrete - Client: Municipality of Maccagno - Lombardy Region - Location: Maccagno (I) - Year: 2010-2011 - Length: 120 m - Displacement: 1,100 tons - Services provided: Structural design, local works control, calculation of incident wave heights, hydrodynamic analyses, structural dimensioning of floating modules in reinforced concrete, external prestressing of the entire structure, mooring system with catenaries and anchor blocks 
- Floating pontoon harbour of Porto Valtravaglia - Floating pontoon harbour of Porto Valtravaglia - Sector: Special structures - Category: Floating pontoons in prestressed reinforced concrete - Client: Municipality of Porto Valtravaglia - Lombardy Region - Location: Porto Valtravaglia - Year: 2010-2011 - Length: 120 m - Displacement: 1,100 tons - Services provided: Structural design, local works control, calculation of incident wave heights, hydrodynamic analyses, structural dimensioning of floating modules in reinforced concrete, external prestressing of the entire structure, mooring system with catenaries and anchor blocks 
- TMD Passerella Torretta in Bellinzona - TMD Passerella Torretta in Bellinzona - Sector: Special structures - Category: Tuned mass damper systems (TMD) - Client: Department of Territory of Canton Ticino - Location: Bellinzona (CH) - Year: 2021-2022 - Services provided: Design and numerical verification of conformity of the tuned-mass damper system (TMD) to control the vibrations of the structure induced by pedestrians, running, air overpressure produced by the passing vehicles of the underlying N2 motorway 
- Tensile structure Villa Costanza Park Lugano - Tensile structure Park of Villa Costanza in Lugano - Sector: Special Structures - Category: Tensile structures - Client: City of Lugano - Location: Lugano (CH) - Year: 2022 - Services provided: Structural design, construction and accounting management with final cost settlement, form finding, dimensioning and construction details of the tensile structure viale carpinata, foundation blocks of the tensile structure 
- Redevelopment of the Paradiso lake shore - Redevelopment of the Paradiso lake shore - Sector: Special Structures - Category: Lakeside structures - Client: Municipality of Paradiso - Location: Lugano-Paradiso (CH) - Year: 2016 - Services provided: Parallel study mandate with selective pre-qualification procedure 
- Advanced dynamics Alptransit Biasca railway bridge over the Froda river - Advanced dynamics railway bridge over the Froda river - Sector: Specialist - Category: Advanced dynamics vibration induced by railway traffic - Client: ALPTRANSIT Biasca - Location: Biasca (CH) - Year: 2007 - Engineer: Dr. Antonio Paronesso formally at Passera & Pedretti SA - Services provided: Numerical modelling and verification of vibrations induced on the structure by the trains of the Alptransit high-speed railway line 
- Stability computation for the Alptransit depot at Sigirino - Sigirino depot of the excavation material coming from the Ceneri base tunnel of the Alptransit railway line - Sector: Specialist - Category: Three-dimensional slope stability analyses and load-bearing body-induced settlements - Client: ALPTRANSIT Gotthard sector Gotthard South - Location: Sigirino (CH) - Year: 2002 - Engineer: Dr. Antonio Paronesso formally at Passera & Pedretti SA - Services provided: Three-dimensional numerical modelling of the stratigraphy of the soil and embankment, three-dimensional Mohr-Coulomb elasto-plastic analysis to determine the settlements of the adjacent railway line and the safety coefficients of the slope 
- CEP Pollegio Exercise Centre - CEP Pollegio Exercise Centre - Sector: Specialist - Category: Geotechnical analyses of static interaction - Client: Alptransit - Location: Pollego (CH) - Year: 2009-2010 - Services provided: 3D numerical modeling of the structure + pile foundations + extended mesh foundation soil, linear static analyses with determination of settlements and stresses in the piles 
- Advanced dynamics Fieu railway underpass - Advanced dynamics Fieu railway underpass - Sector: Specialist - Sector: Advanced dynamics vibrations induced by railway traffic - Client: ALPTRANSIT Biasca - Location: Biasca (CH) - Year: 2008 - Services provided: Numerical modelling and verification of vibrations induced on the structure by the trains of the Alptransit high-speed railway line 
- Advanced dynamics railway bridge over the Brenno river - Advanced dynamics railway bridge over the Brenno river - Sector: Specialist - Category: Advanced dynamics vibrations induced by railway traffic - Client: ALPTRANSIT Biasca - Location: Biasca (CH) - Year: 2007 - Engineer: Dr. Antonio Paronesso formally at Passera & Pedretti SA - Services provided: Numerical modelling and vibration control checks induced on the structure by the trains of the Alptransit high-speed railway line 
- Storage Facility of conditioned radiactive waste JRC Ispra - Heavy Type Stacking - CCR Ispra Conditioned Radioactive Waste Storage Facility - Heavy Type Stacking - Sector: Specialist - Category: Structural analysis of shocks and impacts - Client: Joint Research Centre - European Commission - Location: Ispra (I) - Year: 2010 - Services provided: Analysis of the fork-lift impact against the stacks of the depot. Domino effect study 
- Storage Facility of conditioned radiactive waste JRC Ispra - Drum stacks - JRC Ispra Conditioned Radioactive Waste Storage Facility - Drum Stacks - Sector: Specialist - Category: Structural seismic analysis of shocks and impacts - Client: Joint Research Centre - European Commission - Location: Ispra (I) - Year: 2017 - Services provided: Seismic stability verifications of metal drum stacks 
- Harbour of Gambarogno - Harbour of Gambarogno - Sector: Specialist - Category: Hydrodynamic calculation and dimensioning of floating structures - Client: Municipality of Gambarogno - Location: Gambarogno - Location San Nazzaro (CH) - Year: 2014-2016 - Length: 340 m - Displacement: 3,300 tons - Services provided: In-water structures consultant, hydrodynamic analysis, structural pre-dimensioning of floating pontoon and swing-mooring arms system 
- Justice railway junction in Biasca Alptransit railway line - Justice railway junction in Biasca Alptransit railway line - Sector: Specialist - Category: Three-dimensional settlements analyses induced by loading bodies - Client: ALPTRANSIT Gotthard sector Gotthard South - Location: Biasca (CH) - Year: 2007 - Engineer: Dr. Antonio Paronesso formally at Passera & Pedretti SA - Services provided: Three-dimensional numerical modelling of the stratigraphy of the soil and the overlying infrastructures, to determine displacements and settlements caused by the temporary sequence of construction of the various loading bodies consisting of railway and road embankments 
- Cavanna avalanche protection embankment at Villa Bedretto - Cavanna avalanche protection embankment at Villa Bedretto - Sector: Specialist - Category: Three-dimensional slope stability analyses - Client: Forestry Section Department Canton Ticino - Location: Villa Bedretto (CH) - Year: 2002 - Engineer: Dr. Antonio Paronesso formally at Passera & Pedretti SA - Services provided: Three-dimensional numerical modelling of the embankment with geotextile reinforcement nets, three-dimensional Mohr-Coulomb elasto-plastic analysis for determination of settlements and slope safety coefficients 
- Deposit of excavation material in front of the Lugano belvedere - Deposit of excavation material in front of the Lugano belvedere - Sector: Specialist - Category: Three-dimensional analysis of load-bearing body-induced settlements - Client: Città di Lugano - Location: Lugano (CH) - Year: 2007 - Engineer: Dr. Antonio Paronesso formally at Passera & Pedretti SA - Services provided: Three-dimensional numerical modeling of the stratigraphy of the bottom of the lake in front of the Lugano belvedere and determination of displacements and settlements caused by the deposit of excavation material coming from the construction site of the New Cultural Centre of Lugano NCCL 
- New Cerbios Pharma plant in Barbengo - New Cerbios Pharma Plant in Barbengo - Sector: Specialist - Category: Three-dimensional analysis of load-bearing body-induced settlements - Client: Cerbios Pharma SA - Location: Barbengo (CH) - Year: 2003 - Engineer: Dr. Antonio Paronesso formally at Passera & Pedretti SA - Services provided: Three-dimensional numerical modelling of the stratigraphy of the soil and of the overlying new buildings, to determine displacements and settlements caused by the time sequence of construction of the various buildings 
 
  
 
















































